ST. MICHAEL’S CATHEDRAL BASILICA
Project Details
Description: | Restoration and Addition |
Location: | Toronto, Ontario |
Owner: | Archdiocese Of Toronto |
General Contractor: | Buttcon Limited |
NRE Role: | Detailing, Fabrication, Erection, Steel Deck |
Year: | 2015 |
Tonnage: | ±300 tons |
Overview: | The project involved four main phases of work for NRE. The existing pinnacles, high above street level were deteriorated and nearly separated from the building structure. NRE installed new steel bases and tension rods providing a secure base to re-build the pinnacles. The work on the interior involved installing a new choir / organ balcony and a new sacristy floor inside. NRE was also contracted for the installation of the new St. John's Chapel Atrium. |