Project Details

Description: Restoration and Addition
Location: Toronto, Ontario
Owner: Archdiocese Of Toronto
General Contractor: Buttcon Limited
NRE Role: Detailing, Fabrication, Erection, Steel Deck
Year: 2015
Tonnage: ±300 tons
Overview: The project involved four main phases of work for NRE.
The existing pinnacles, high above street level were deteriorated and nearly separated from the building structure. NRE installed new steel bases and tension rods providing a secure base to re-build the pinnacles.
The work on the interior involved
installing a new choir / organ balcony and a new sacristy floor inside.
NRE was also contracted for the installation of the new St. John's Chapel Atrium.