| Description: |
Building the 10-storey, 190,000-square-foot structural framework for the McMaster DeGroote School of Business expansion. |
| Location: |
Hamilton, ON |
| Owner: |
McMaster Universithy |
| General Contractor: |
Buttcon |
| NRE Role: |
Fabrication, Erection, Steel deck, shear studs |
| Year: |
2024 |
| Tonnage: |
2100 |
| Overview: |
Site Constraints: Navigating a very compact, busy university site layout while executing crane procedures and heavy lifts safely. Key Milestone: The project reached its official "topping out" milestone in April 2024, when Niagara Rigging raised and secured the final structural steel beam into place on the upper structure |