Project Details

Description: New heavy industrial building for automotive stamping
Location: Milton, Ontario
Owner: Magna International
General Contractor: McKay Cocker
NRE Role: Erection, Steel Deck
Year: 2017
Tonnage: ±800
Overview: New heavy compact industrial building addition to existing Karmax facility in Milton.
Heavy built up 15 Ton soldier columns for 70 Ton Capacity overhead crane runway sitting on 40 Inch beams. 120 FT long roof trusses. Heavy checker plated floors for plant equipment. Complete reinforcement of adjacent existing roofs for added snow loads. Heavy checker plated floors for plant equipment. The steel members and connections on this project were designed extra heavy due to the amount a vibrations created by the steel stamping process the building was constructed for.