HWY 401 OVER DON RIVER
Project Details
| Description: | HWY 401 Don River Bridge |
| Location: | 401 Eastbound Collector over the Don River |
| Owner: | MTO |
| General Contractor: | Brennan Paving |
| NRE Role: | Steel erection |
| Year: | 2024-2026 |
| Tonnage: | 1000 |
| Overview: | Highway 401 Eastbound Collector Widening: Niagara Rigging and Erecting completed critical steel erection work for the Stage 1 widening of the Highway 401 Eastbound Collector over the Don River in 2024. The Metrolinx corridor bridge was erected in 2025. And the final phase of the Don River bridge was completed in 2026. |